Free Quote Template: Edit Online, Download as PDF
Free quote templates for trades and services. Edit online, download a PDF, and see what to include: line items, totals, a valid-until date and sign-off.

Pick a free quote template below, swap in your own prices and download it as a PDF to send. Each one already holds what a customer looks for before saying yes: your details and theirs, the work priced line by line, how long the price holds and a place to sign. Start from a free one pager template.
One‑Pager examples
Real One-Pagers made with MakeOnepagers. Open any one to edit it as your own.
Landscaping Quote: Backyard Patio and PlantingsEdit for free(opens in a new tab)
Plumbing Quote: Water Heater ReplacementEdit for free(opens in a new tab)
Electrical Quote: Panel Upgrade and EV ChargerEdit for free(opens in a new tab)
Web Design Quote: 8-Page Small Business WebsiteEdit for free(opens in a new tab)
Moving Quote: 3-Bedroom Local MoveEdit for free(opens in a new tab)
Catering Quote: Wedding Reception, 128 GuestsEdit for free(opens in a new tab)

Free quote templates to edit
Pick the one closest to your job and change the names and prices to yours:
- Home and building trades: plumbing quote, roofing quote, HVAC quote, electrical quote
- Outdoor and moving jobs: landscaping quote, moving quote
- Events, print and web: catering quote, print shop quote, web design quote
Each one is made with MakeOnepagers and downloads as a PDF you can email or print.
A free quote template, part by part
Edit this template
| Part | What to write |
|---|---|
| Your details | Business name, phone and email |
| Customer details | Name, address and phone |
| Quote number and date | So you can both find it later |
| Valid until | The last day this price holds |
| The work | What you will do, in plain words |
| Line items | Labor and materials on separate lines, each with its price |
| How you charge | A flat price, an hourly rate or both |
| Total | Subtotal, tax and the total |
| Payment terms | Deposit, when the rest is due and how to pay |
| Start and finish dates | When you can begin and when it will be done |
| If the price changes | How you will ask before you go over |
| Approval | A line to sign or a reply that says yes |
If you only have room for six parts, keep the work, the line items, the total, the valid-until date, the price-change line and the approval.
A sample quote, filled in
Here is a quote for a fence repair from a made-up fence company. The prices are only an example, so swap in your own rates.
Edit this template
Quote Q-1042, issued October 27, 2026, valid until November 26, 2026
- Work: replace 3 rotted posts set in concrete 2 ft deep, rehang 24 ft of cedar pickets matched to the fence, then haul the old wood away.
- Labor: 6 hours at $65 an hour, $390.
- Materials: posts, concrete, pickets and screws, $284, with an itemized receipt on request.
- Haul away: a flat $40.
- Subtotal: $714.
- Sales tax: 8.25% on the $284 of materials, $23.43.
- Total: $737.43.
- Deposit: $357, half the price before tax.
- Start: within 10 days of your yes, with about one day of work on site.
- If the price changes: if we find rot past the three posts once the old ones come out, we will call you and get your OK before any extra work.
- Approval: sign below, or reply "Yes" to this email.
The customer sees what each dollar buys and when the work starts. They also know the price holds for 30 days, that nothing gets added without a call, and how to say yes. You can open this fence repair quote and type your own job over it.
Quote, estimate or invoice?
A quote is the price you offer for a job before you do it. People also call it a price quote, a sales quote or a service quote. An estimate is a close cousin. It is your best guess at the price, and the final bill can move. An invoice comes after the work and asks to be paid.
So the quote comes first, and if your customer says yes, the same lines can become your invoice once the work is done. For the order to fill it in, from the site visit to the signature, see how to write a quote for a job.
What 3 state repair-estimate laws ask for
Florida, California and Ohio each set out what a written repair estimate must show, and we read all 3 rules on October 27, 2026. Florida and California put theirs in statute, and Ohio's is a rule from its attorney general.
These 3 rules cover car repair shops only. We read them because they are a public, written answer to one question. What does a customer need to see before saying yes?
| What the rule asks for | Rules that ask |
|---|---|
| A price before work starts, at least on request | 3 of 3 |
| The customer's approval first | 3 of 3 |
| A rule for a higher final bill | 3 of 3 |
| The date of the estimate | 2 of 3 |
| A completion date | 2 of 3 |
The 3 rules are Florida Statutes 559.905, California Business and Professions Code 9884.9 and Ohio Administrative Code 109:4-3-13. Florida and Ohio ask for the estimate date and the completion date. California's section asks for neither.
Florida's list is the longest. Its estimate must hold 14 items once a repair will cost more than $150. They include your name and phone, the customer's details, the date and time, the work asked for and the completion date. You also state the payment method and what is guaranteed, and for how long. Our auto repair quote is laid out as that kind of written estimate, with the time it was written, the time the car will be ready, the guarantee and a line to authorize the work.
Edit this template
The 3 rules agree on 3 things:
- The price comes before the work. Each rule gives the customer a price, or the right to ask for one, before any work starts.
- The customer approves first. California bars work until the customer says go. Florida has the customer sign a choice of estimate before work starts, and Ohio has them initial one.
- A price change needs a rule. Florida lets the customer set a cap. California asks for consent before the extra work. Ohio says the bill stays within 10% unless the customer approves more.
Maybe you don't fix cars. Still, the same parts make any quote easier for your customer to say yes to, because they answer what people want to know before they agree to pay.
When the price has to change after the customer says yes
None of the 3 quote template pages we compared (Invoice Simple, InvoiceFly and Billdu) says what to do when the price has to go up. Yet jobs change. You pull an old post and find the rot runs further down the line, or a part costs more than it did last week. The state rules plan for this moment, and your quote can too.
- Say it on the quote. One line such as "We will ask before we go over this price" sets the rule early.
- Ask before you do the extra work. California's rule asks for consent after you learn the price is too low and before the extra work starts.
- Get the yes in writing. California accepts email for a higher price. Keep that reply with the quote.
- Send a new total. Update the quote, keep the same number and add "revised" with the date.
Some trades put a number on it. The roofing quote above replaces up to 3 sheets of rotten decking at $95 each, with photos, and stops for the owner's OK past that. A heating and cooling quote does it another way: if the inspector asks for a code fix nobody could see on the first visit, the new cost goes in writing and nothing happens until the owner says yes.
Edit this template
This is general information. It isn't legal advice, so if your trade has its own rules, read your state's version.
Word, Excel, PDF or a designed One-Pager?
Word and Google Docs are easy to edit. Excel and Sheets do the math for you. A PDF is what you send, because the layout stays put on any phone.
A designed One-Pager helps when the quote also has to win the job. You can add your logo, a photo of past work and a clear yes box. Then download it as a PDF.
A quote for goods works the same way, with a quantity and a unit price on each line in place of hours.
Edit this template
Send a quote your customer can say yes to
Open the free price quote template and change the words and prices to yours. Add a valid-until date and a line on price changes before you send it. Or paste your notes into the free AI One-Pager generator and get a finished quote back to edit.
Frequently asked questions
How long should a quote be valid?
Choose a period you can hold your own costs for, then write the end date on the quote. Our sample holds for 30 days, to November 26. If your material costs change often, use a shorter period.
When should you send a price quote?
Send it soon after you have seen the job and before you start any work, while the details are fresh for both of you.




