Process Map vs Flowchart: How One Agency Draws Each

Process map vs flowchart, from a state agency that charts a project's start both ways: 5 lanes and 20 tasks on the map, 7 boxes on the flowchart.

By Megan Holloway

Updated · 8 min read

Process Map vs Flowchart: a tall sheet with a single column of boxes and one diamond, pinned beside a wide sheet split into four colored horizontal lanes with arrows crossing between them

When you compare a process map vs flowchart, you're comparing two drawings of the same work. Your flowchart shows the steps of a process, in order, with the decisions along the way. Your process map does that and adds who does each step, usually in rows called swimlanes, and often the time and measures at each step. So a flowchart answers "what happens next?" while a process map also answers "whose job is it?" Start from a free one pager template.

One‑Pager examples

Real One-Pagers made with MakeOnepagers. Open any one to edit it as your own.

Pinterest pin comparing a process map and a flowchart from one New Jersey agency: the swim lane map has 5 lanes, 20 tasks and 2 decisions, the top-down flowchart has 0 lanes, 7 boxes and 0 decisions

They aren't rivals. The American Society for Quality files them in the same family: "A flowchart is a common type of process map." Think of your flowchart as the simplest map, and the swimlane map as the one you draw when hand-offs are where things go wrong.

FlowchartProcess map
What it showsSteps and decisions, in orderSteps, decisions and who owns each one
Shape on the pageUsually one column or row of boxesRows or columns, one per role or team
Extra detailsRarelyOften time per step, inputs, outputs and measures
Best forExplaining how a process worksFinding delays, hand-offs and gaps
Standards behind itISO 5807 symbolsBPMN pools, lanes and gateways
Who draws itOften one person who knows the stepsOften the people who do each step, together

One state agency, two kinds of chart

The New Jersey Department of Transportation publishes its project charts online. Its flow charts page says it uses two kinds: a Top Down Flow Chart for "the high-level view of how a process works," and a Swim Lane Flow Chart that also "shows how key stakeholders are involved with each activity." It adds that the swim lane version "is more detailed."

That gives you a rare side-by-side. We opened both charts for the early part of a project and counted every shape. They don't cover the same ground: the flowchart is the whole Problem Screening phase, and the swim lane map follows one job, constructability, from the problem statement through Concept Development.

The flowchart: 7 boxes and no lanes

The Problem Screening flowchart fits on one 8.5 by 14 inch page. It runs top to bottom from a Start oval to an End oval, through 7 numbered boxes, from "Review Problem Statement" to "Obtain Problem Screening Approvals."

There are no lanes and no decision diamonds. At box 1.3, arrows simply fan out three ways: withdraw, send a maintenance work order, or carry on. Who does the work is written in a note beside each box. You read the chart for the order of things, and read the notes to find out whose desk each step lands on.

The process map: 5 lanes, 20 tasks, 2 decisions

The constructability swim lane chart is a wide 11 by 17 inch page that runs left to right. It has 5 lanes, from Project Manager at the top to subject matter experts at the bottom. We counted 20 task boxes, 2 decision diamonds with Yes and No branches, 6 document shapes and 4 ovals.

Here the owner is the row itself. The constructability lane holds 9 of the 20 tasks, so your eye goes straight to who carries the load. At the site visit step, one arrow splits into three lanes at once, which tells you three groups have to clear their calendars together. A flowchart can't show you that without a paragraph of notes.

CountTop-down flowchartSwim lane process map
Page8.5 by 14 inches, portrait11 by 17 inches, landscape
Lanes05
Steps7 boxes20 tasks
Decision diamonds02
DocumentsNone drawn6
Where you find the ownerIn a note beside each boxIn the lane the box sits in

What the standards say

Two standards sit behind these charts. Neither one forces you to pick, but they explain the shapes you'll draw.

ISO 5807 is the flowchart standard. It dates from 1985, runs 25 pages, and was last reviewed and confirmed in 2019. It "defines symbols to be used in information processing documentation," which is where the boxes, diamonds and ovals you already know come from.

BPMN 2.0.2, from the Object Management Group, is the standard most process maps follow. It's 532 pages, but the part you need is small. Events are circles, activities are rounded boxes, and gateways are diamonds. The spec admits where the diamond came from: a gateway "is a diamond, which has been used in many flow chart notations." What BPMN adds is the swimlane. A pool stands for a participant, and a lane is "a sub-partition" that sorts the activities by who does them.

The spec even says it "follows the tradition of flowcharting notations for readability." In other words, a process map is a flowchart that learned to show you the people.

Five process maps, and what the lanes add

The companies and numbers in these MakeOnepagers maps are invented. Each one shows you something you'd lose if you drew it as a plain flowchart.

Hiring, where the delay hides between roles

A warehouse hiring process map One-Pager made with MakeOnepagers for a logistics site hiring 40 pickers a month: swimlanes for recruiter, candidate, shift lead and safety, an applicant funnel, days per step against target and what keeps people comingEdit this template

This warehouse hiring process map has four lanes: recruiter, candidate, shift lead and safety. The goal printed under the photo is "40 pickers a month, hired in 10 days, not 24." A flowchart could list the six steps from posting to first shift. Only the lanes show that the candidate waits on three different people along the way.

A month-end close with an owner for every step

A month-end close process map One-Pager made with MakeOnepagers for a finance team of four: a close in 6 days down from 9, the close step by step from cut-off to the board pack, a table of who owns each step with inputs and outputs, bottlenecks and fixesEdit this template

The month-end close process map shows the steps as a simple flow, from Day 1 cut-off to the Day 6 board pack. Then it adds a table of owners, inputs and outputs. That table is what turns a flowchart into a process map. You can see the staff accountant owns both the bank match and the accruals, so a sick day there moves the whole close.

Purchase to pay, with time at each step

A purchase to pay process map One-Pager made with MakeOnepagers for a fabrication company: five stages from request to pay, swimlanes for requester, purchasing, receiving and accounts payable, and a table of time at each step today against target with why it waitsEdit this template

ASQ lists "time at each step" as something a process map can carry, and this purchase to pay map does exactly that. Payment takes 41 days against a 30-day target, because invoices arrive missing a PO number. Approvals take 3.5 days because they "sit in email." Those are the reasons you'd draw a map in the first place.

Support escalation, with decision rules

A support ticket escalation process map One-Pager made with MakeOnepagers for a scheduling software company: three support tiers with the share each solves, a ticket that climbs through swimlanes from customer to product engineer, and a table of when to escalateEdit this template

Decisions are where flowcharts shine, and your process map should keep them. This support ticket escalation map puts each tier in its own lane, then lists the rules that move a ticket up. A bug reproduced on 2 accounts goes to Tier 2 within 4 hours. Data that looks wrong goes there within 1 hour. Tier 1 solves 78% of tickets, so you know where most of the work lands.

A quality hold, where the signature matters

A quality hold process map One-Pager made with MakeOnepagers for a plastics plant's Line 3: an inspection photo, swimlanes from operator to customer service, decision rules with who signs each one, and this year's holdsEdit this template

The quality hold process map turns a decision diamond into a small table. All samples in spec means release the lot, signed by a quality tech. A safety feature affected means scrap and tell the customer, signed by the plant manager. A flowchart would show the diamond. Your process map shows whose name goes on it.

Which one should you draw?

Start with the question you need answered, and draw it with your team. ASQ says "people who perform the process should draw it."

  • Explaining a process to a new person: a flowchart. Keep it to one column.
  • Fixing a process that's slow or keeps failing: a process map with lanes, so the hand-offs show.
  • A process inside one team: a flowchart is usually enough.
  • A process that crosses three or more teams: a process map. NJDOT's constructability map needed 5 lanes.
  • Writing a procedure people follow step by step: a flowchart, with a note on who does each box.

You can also do what NJDOT does and keep both, a top-down flowchart for each phase and a swim lane map for each job that crosses teams.

Make your process map

Choose a MakeOnepagers process map close to your own work, rename the lanes for your roles, and replace the steps. Already have the steps in a list or an old slide? Paste it into the free AI One-Pager generator to lay out the flow, then sort each step into its lane by hand. See more layouts in our process map examples.

Frequently asked questions

How do a process map and a flowchart differ?

A flowchart shows the steps and decisions in order. A process map shows the same steps plus who does each one, often in swimlanes, and can add time, inputs and measures at each step.

Is a flowchart a type of process map?

Yes. The American Society for Quality says "a flowchart is a common type of process map." The swimlane map is the more detailed kind.

What is a swimlane diagram?

A process map where each row or column belongs to one role, team or system. NJDOT calls it a swim lane or cross-functional flow chart. In BPMN, the rows are called lanes, grouped inside pools.

What symbols does a flowchart use?

ASQ lists 8 common ones, including the step box, the arrow, the decision diamond, the document shape and the start and end oval. ISO 5807 sets the formal symbols.

When should you use a process map instead of a flowchart?

When more than one team touches your process, or when you're trying to find where it slows down. Your lanes make the hand-offs and waiting easy to spot.

Found this useful? Share it

Due Friday? Skip the three hours of formatting

You know what it will sayMake it look professional without the hours

Start your 7-day free trialTry free for 7 days

Designer templates, ready to edit in minutes