Process Map Examples, Plus How 6 Cities Map the Same Permit
Five process map examples, each built around a question you might have before you draw, plus what 6 public building permit maps show and leave out.

A process map lays out the steps of a job in the order they happen. A good one also gives each role its own lane and shows where the work waits and where it splits into a yes or a no. Start from a free one pager template.
One‑Pager examples
Real One-Pagers made with MakeOnepagers. Open any one to edit it as your own.
Process Map: IT Access RequestEdit for free(opens in a new tab)
Process Map: Small Business Loan ApplicationEdit for free(opens in a new tab)
Process Map: Patient IntakeEdit for free(opens in a new tab)
Process Map: Month-End CloseEdit for free(opens in a new tab)
Process Map: Returns and RefundsEdit for free(opens in a new tab)
Process Map: Restaurant Order to TableEdit for free(opens in a new tab)

To see how often real maps manage that, we read 6 maps of the same process, getting a building permit, from US cities, counties and one territory. Four of the 6 draw a decision. Only 2 give each role its own lane, and only 2 say how long a step takes. The five MakeOnepagers examples here each take one question you might have before you draw your own, and each adds the lanes or the times those public maps tend to skip.
What does a purchase to pay process map look like?
Edit this templateSample company and owner. Your own steps and times go in the same boxes.
If you run a finance team, purchase to pay is probably your first map, and this one keeps it to five stages. A request is raised, approved, ordered, received and paid. Any purchase over $5,000 goes to the plant lead, and that rule sits right on the arrow where it applies.
Below the arrows, four lanes show which team touches each step. That's the view your new hire needs, because it shows that receiving logs the goods and accounts payable matches the invoice. The time table is where the map earns its place on the wall. Approval takes 3.5 days against a target of 1, and payment takes 41 days against 30 because invoices arrive without a PO number.
Purchase to pay suits any process that crosses three or four departments and runs slow. The "why it waits" column turns your map into a list of fixes.
How do you show a decision on a process map?
Edit this templatePlant, line and figures are samples.
On a factory floor, your hard part is knowing who may make each decision. This quality hold map gives every finding its own row, with the decision and the name of the role that signs it. All samples in spec means a quality tech releases the lot. Any part out of spec holds the whole lot for the quality manager. A safety feature affected means scrap and a call to the customer, signed by the plant manager.
The hold log shows the rows earn their space. Line 3 opened 31 holds from January to June, and the time from tag to decision fell to 5.5 hours, from 9.5 hours the year before. Bad parts shipped: 0, on a target of 0. When your operators can read the answer off a row, your lot doesn't sit tagged while someone hunts for a manager.
Its floor rules close the loop with one line you'll want on your own map: never release a lot without a signature.
How do you map a process the public goes through?
Edit this templateDistrict name and figures are made up for the demo.
When the people following your map are outsiders, give them their own short version first. This enrollment map opens with four steps a family can follow, from applying online in English or Spanish to the welcome visit before day one.
The swimlanes underneath are for your staff. They show the hand-offs a family never sees, such as the enrollment office requesting old school records and the nurse checking shots. A short list tells families what to bring, so nobody makes a second trip for a birth certificate.
The last block is one you'll rarely see on a public map, the places the process used to stall. Paper forms got lost between offices, records were asked for by mail and one clerk covered July. Fixing those took the time from application to placement down to 4 days from 10, and 93% of new students were placed before day one.
How do you add times and targets to a process map?
Edit this templateSite, owner and counts are samples.
Put the time on the step, and put the target right beside it. This hiring map shows four stretches, from application to the first solo shift, each as a bar for today's days against the target. The biggest gap is offer to start, at 9 days against a target of 5.
A funnel beside it shows what your slow steps cost you. Last month 410 people applied, 160 were screened, 72 were interviewed and 41 started. When the gaps between steps shrink, fewer of those 410 drift off to another job.
The photo caption sums up the goal in a line, 40 pickers a month, hired in 10 days instead of 24. Every bar on the page is measured against that one target.
How do you map a hand-off between teams?
Edit this templateCompany and targets are samples.
A hand-off is where your work gets lost, so give it its own rule. This support map traces one ticket as it climbs from the customer through three tiers and back down again. Tier 1 solves 78% of tickets, tier 2 solves 19% and tier 3 takes the last 3%.
The escalation table is the heart of it. Each signal tells you who it goes to and how fast. A bug reproduced on 2 accounts goes to tier 2 within 4 hours, and a site down for many customers goes to the on-call engineer within 15 minutes.
The callout at the bottom is the line your team will remember. The customer never repeats themselves, because every escalation carries the steps already tried, the account and the screenshots. The escalation rate is down to 22%, from 31% last year.
All five maps above are swimlane maps, the kind most teams need, with one lane per role and the steps in order. For other types, such as a value stream map, see our process map templates post.
Which map fits a process like yours?
The six maps in the grid below cover processes the five above don't touch. Each one carries a block you can borrow, so find the row that sounds like your own work.
| Your process | Map in the grid | The block to borrow |
|---|---|---|
| A loan, or any approval that goes to a committee | Small business loan, Prairie Commons Credit Union | Days at each step against target, with the committee at 7 days against 2 because it meets every other week |
| Someone arriving at a front desk | New patient intake, Riverbend Family Clinic | A door to doctor time of 38 minutes against a 15-minute target |
| A monthly deadline | Month-end close, a finance team of four | A day number on every step, with the close down to 6 working days from 9 |
| Returns or refunds | Returns and refunds, Wren & Pine Home Goods | Decision rules in a box, such as store credit for anything past 30 days |
| Access to systems or files | IT access request, Marlow & Finch | A RACI table, marking who is responsible, accountable, consulted or informed on each task |
| A rush at a counter or a kitchen pass | Order to table, Saltgrass Kitchen | 18 minutes from order to table at the 7 pm peak, across 212 covers on a Friday |
The clinic, the kitchen and the finance team each set where the process breaks today beside the change that fixes it, and the loan map does the same with its delay column. At the clinic, insurance is checked at the desk on the day of the visit, and the fix moves that check to the day before. In the kitchen, plates wait under the lamp because nobody runs them, so one runner now works the pass from 6 to 9 pm. A map with that pairing tells your reader what's wrong and what changes next.
The access map ends on a single rule in a box, "No access without an end date." Every role is reviewed each quarter, and anything unused for 90 days is removed. A rule that short is easy for your staff to remember, and easy for you to check at each quarterly review.
Public process maps we read
Every one of these six maps covers the same job, from application to final inspection, so the differences you'll see come down to how each place chose to draw it. We opened them on October 30, 2026 and counted what each one shows.
| Map | Pages | Lanes for each role | Decisions drawn | Step times printed |
|---|---|---|---|---|
| City of Taylor, Texas | 1 | Yes, applicant and staff lanes | Yes | Yes, 1 to 2 days to check completeness, 10 days of technical review |
| County of Ventura, California | 1 | No | Yes, 4 questions | No |
| City of Victoria, Texas | 1 | No | Yes, plan approval | Yes, review takes 5 to 10 days |
| City of Morro Bay, California | 1 | Yes, applicant and city actions | Yes, 3 questions | No |
| Modoc County, California | 2 | No | No | No |
| CNMI Department of Public Works | 3 | No | No | No, only that a permit lasts 180 days |
If you only open one, make it Taylor's. It splits the page into applicant and staff lanes, asks its decisions as plain questions like "Fees Paid?" and prints the days beside the review. It even admits in a note that the chart doesn't show every step.
Morro Bay shows you the lanes with a simple legend for applicant actions and city actions. It also shows how one permit fans out to building, planning, public works, fire, the harbor for waterfront work and health. Ventura asks four clear yes or no questions and runs two reviews side by side. Each box names who acts, the customer, Building and Safety or another agency, but with no lanes you have to read every box to follow one role.
Modoc County is a useful contrast. It covers the same process in two pages of written bullets, down to the $55 planning fee, with no boxes or arrows. It's complete, yet you can't see at a glance where you are or what you do next. That's the gap a drawn map fills.
Victoria is the only map that splits the path at the first step by the kind of building, with one- and two-family homes on one side and multifamily and commercial work on the other, so you know your path from the first box. A footnote adds that the second group needs site plan approval before a permit is issued. The CNMI Department of Public Works chart puts its boxes on the first page and spends the next two on written steps, down to handing in at least two copies of the drawings.
If you're mapping a public process, borrow Taylor's lanes and its printed times. Our process map template has room for those times beside each step.
A map needs an owner
Your map is only right until someone changes a step. After that, whoever spots the change needs a person to tell, or your chart slowly stops matching the work.
Halvorsen's purchase to pay map ends on that person, in a process owner block naming the controller, Greta Lindqvist, with her phone number. With a person to call printed on the map, a changed step gets reported instead of ignored, and the map you keep in MakeOnepagers stays as current as the process it shows.