Mine Site Report One-Pager
Show ore moved, cost per tonne and what went wrong. Mine managers use it for half-year reviews.
Make one freeFree, no account needed
What’s on It
- Waterfall chartWhat Moved the Cost per Tonne
- Small charts side by sideSix Months, Three Measures That Do Not Share an Axis
- Key factsWhat Came Out of the Pit
- Key factsWhat It Took to Move It
- Do and don't listWhat the Haul Road Taught Us
Sample One-Pager. Company and figures are made up.
Mine Site Performance: H1
Kaparra Open Pit · Ore, waste and unit cost · January to June · Figures in A$
What Moved the Cost per Tonne
Six Months, Three Measures That Do Not Share an Axis
Ore mined
Strip ratio
Truck availability
What Came Out of the Pit
Ore mined, H12.55 Mt
Waste moved, H18.94 Mt
Strip ratio, H13.51 : 1
Head grade1.18 g/t
What It Took to Move It
Unit costA$40.20 / t
Fleet18 haul trucks, 3 excavators
Truck availability86.2% average
Reserve life at this rate9.4 years
What the Haul Road Taught Us
Do
Water the ramp before the afternoon shift
Re-survey the haul profile at every stage change
Don't
Run oversize through the primary crusher
Defer tyre changes past 4,000 hours