MakeOnepagers
Industry & energy

Mine Site Report One-Pager

Show ore moved, cost per tonne and what went wrong. Mine managers use it for half-year reviews.

Make one freeFree, no account needed

What’s on It

  • Waterfall chartWhat Moved the Cost per Tonne
  • Small charts side by sideSix Months, Three Measures That Do Not Share an Axis
  • Key factsWhat Came Out of the Pit
  • Key factsWhat It Took to Move It
  • Do and don't listWhat the Haul Road Taught Us

Sample One-Pager. Company and figures are made up.

Mine Site Performance: H1
Kaparra Open Pit · Ore, waste and unit cost · January to June · Figures in A$
What Moved the Cost per Tonne
384043$38.4H2 unit cost+$2.1Diesel+$1.8Longer haul from Stage4−$1.2Fleet availability−$0.9Blast redesign$40.2Total
Six Months, Three Measures That Do Not Share an Axis
Ore mined
462 ktJanJun
Strip ratio
3.9JanJun
Truck availability
89.1%JanJun
What Came Out of the Pit
Ore mined, H12.55 Mt
Waste moved, H18.94 Mt
Strip ratio, H13.51 : 1
Head grade1.18 g/t
What It Took to Move It
Unit costA$40.20 / t
Fleet18 haul trucks, 3 excavators
Truck availability86.2% average
Reserve life at this rate9.4 years
What the Haul Road Taught Us
Do
Water the ramp before the afternoon shift
Re-survey the haul profile at every stage change
Don't
Run oversize through the primary crusher
Defer tyre changes past 4,000 hours

Make One from Your File

Drop in a PDF, Word or PowerPoint file. Get your One-Pager in a minute or two.

Make one free